Hi guys,
Well my week off is nearly over so i had better give an update as to what i have achieved this week.
The first thing to do was to fit the floor pan. This is done by turning the chassis upside down and placing the pre-cut floor pan in the correct position.
This however wasn't possible due to the pan being to big! So out came the tin snips and it was soon trimmed to the right size. The floor pan was then clamped on and all the chassis bars marked out ready for drilling. once the chassis/pan were drilled it was ready to be fitted. This is done with rivets and polyurethane sealant. I ran a bead of sealant around all the chassis bars then clamped the pan in place and started fitting the rivets. Working from the centre of the floor pan. The first few rivets i used i found fun to do but after that it was soooo boring! I was happy with the end result though.
Friday, 7 November 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment